Skip to main content

Leak Audits

Published: 2022-05-10      Revised: 2026-09-02

NameDescriptionType
Chronic Leaks – 5000 PPM (Two >=5000 PPM Leaks on non-control Valve in 12 Months)Alerts when a non-control valve has had two or more leaks of over 5000 PPM within 12 months.Event
Chronic Leaks on NonControl Valves (3 or More Leaks in 24 Month Period)Identifies components with three leaks within a 24-month period.Event
Late Leak ResponsesAny leaks past due with a First Attempt, First ReTest, or Final Response past due.Event
Leak Response Due in 3 DaysAny leak with a First Attempt, First ReTest, or Final Response due in 3 days or less.Clearing State
Leaks Closed without PASSing PPMLeaks closed with a Close Reason other than Pass.Event
Quick RepairsInspections with a PPM between the Quick Repair threshold and the lowest leak definition for that component. See Quick Repair/Action Level for more details.State
Quick Repair Response Due in 2 DaysQuick Repairs that have not had an attempt recorded on them and are due in 2 days or less. See Quick Repair/Action Level for more details.Clearing Event
Zero Leaks with >= 75% of M21 Inspections completedLUnits with 0 leaks when 75% or greater of the components on a given monitoring frequency have completed a Method 21 inspection. AVO inspections do not count toward the percentage.State

See Types of Audits for descriptions of the "Type" column terms above.