Mass Import of Inspections

Published: 2024-11-20      Revised: 2024-11-25

If you prefer to import multiple inspections at once rather than entering them individually, you can use our mass import template to document the inspection information. Once completed, email the file to our Support Team for processing. Please note that all fields in the template are mandatory.

Important Note: There may be a charge for the import service.

Field Requirements​

FieldDescription
Date and Time of InspectionEach inspection must include both a date and a time. While the time stamp can be the same for all records, it must be present for every entry.
UnitSpecify the LUnit where the component is located.
TagIndicate the component on which the inspection is being logged.
AnalyzerAn analyzer must be included for every record, even for AVO inspections.
Inspection TypeFor AVO or OGI inspections: You can leave the Background and PPM fields blank. The Result field is required and must be recorded as either Pass or Fail. For M21 inspections: The Background PPM and PPM fields must be filled in. The Result field can be left blank.
ResultThis field is mandatory for AVO or OGI inspections and must be logged as either Pass or Fail.