New Operations Dashboard (Beta)​

Note: The Operations Dashboard is a Beta feature. To have it enabled for your database, please reach out to LDARtools Support.

The Operations Dashboard gives coordinators and managers a real-time view of inspection progress, tour coverage, leak health, technician performance, and database configuration status — all in one place. It replaces the need to run reports or navigate multiple pages to check on field progress.

The dashboard is per-user customizable: widgets can be shown, hidden, resized, and reordered. Your layout is saved to your profile and carries across devices and browsers.

Header and Period Controls​

At the top of the dashboard:

  • Period display — shows the current quarter or month, week number, and days remaining (e.g., Q2 2026 · Week 13 of 13 · 6 days remaining)
  • Quarter / Month toggle — switches all inspection burndown widgets between quarterly and monthly view
  • UPDATED [time] AGO indicator — confirms when the dashboard data last refreshed (green dot = live)
  • Edit Dashboard button — enters edit mode to rearrange, resize, show, hide, or add custom widgets

Editing the Dashboard Layout​

Click Edit Dashboard to enter edit mode. In edit mode:

  • Drag handle (≡ icon on each widget title bar) — drag to reorder widgets
  • Size controls (¼, ½, ⅔, Full) — resize a widget to take up a fraction of the page width
  • × button — hides a widget. Hidden widgets are listed at the top of the page under Hidden widgets with a Show link to restore them
  • Reset to default link (top-right) — restores the original widget layout and sizes
  • + Add Custom Widget button (bottom of the page) — adds a new custom chart or table to your dashboard (see Custom Widgets below)
  • Click Done Editing to save your layout

Custom widgets also show Edit and Delete buttons in edit mode.

Inspection Burndown Cards​

One card per active inspection type (M21, AVO, OGI, CT). Each card shows progress for the current quarter or month (toggle between them at the top of the page).

ElementDescription
Large NumberInspections completed so far this period (shown in red if behind required pace)
of [N]Total inspections required this period
Progress barRed fill = actual progress; grey fill = required pace
% complete · RemainingPercentage done and count of inspections still needed
Line chartSolid blue line = actual daily progress; dashed line = required daily pace to finish on time
Short by ~[N]Projected shortfall at current pace if the period ended today
Pace / NeedActual inspections per day vs. inspections per day needed to close the period on time
Remaining breakdownRule-driven vs. manual inspection requests still open
View [N] Remaining →Deep-link to the Schedule filtered to remaining open requests
Nothing due this periodShown when no inspections are required for this type this period

Tour Coverage​

The Tour Coverage table shows how much upcoming inspection work has been added to a tour, across multiple time windows.

Column groupDescription
WindowTime horizon: This Week, This Month, This Quarter, This Year
DUE — Total / M21 / AVO / OGINumber of pending inspection requests due within the window
IN TOUR — Total / M21 / AVO / OGIRequests that are currently on a tour. Total shows the percentage covered and a rule-driven vs. manual breakdown. Click an IN TOUR cell to open the Component Grid filtered to those components.
NOT IN TOUR — Total / M21 / AVO / OGIRequests not yet assigned to any tour. Click a NOT IN TOUR cell to open the Schedule filtered to that untoured work.

Deadline Pressure​

Four summary cards for open compliance obligations that need attention:

CardShows
Open LeaksCount of leaks currently open. Deep-links to the Leak grid.
Overdue Leak ResponsesLeaks where the next required action (attempt, retest, or final resolution) is past its deadline.
Approaching Deadline ≤2DLeaks whose next required action deadline is within 2 days.
Awaiting AttemptLeaks that require a first attempt and have not had one recorded yet.

Each card is a deep-link — click to navigate directly to the filtered list.

Technician Scorecard​

A table summarizing field performance for all active technicians this quarter.

ColumnDescription
TechnicianTechnician name
Field DaysDays in the field this period
InspectionsTotal inspections completed
ThroughputInspections per field day
Avg LSTAR ScoreAverage daily LSTAR monitoring quality score
Leak RatePercentage of inspections that found a leak
StatusFlag (potential quality concern) or Ok

A Flags badge at the top shows the total number of flagged technicians. Click any row to open the Tech Detail panel for that technician.

Tech Detail panel

The Tech Detail panel slides out on the right when you click a technician row. It shows:

  • Header: name, period, flag/ok status, field days, inspection count, signal count
  • PPM Distribution — bar chart of readings across PPM buckets (0–1, 1–3, 3–5, 5–10, 10–100, 100–1000, 1000+). Blue = this technician; grey = site average. Also shows zero-reading percentage and entropy score vs. site average.
  • Leak Find Rate — this technician's leak rate vs. site average
  • Background PPM Frozen — flags if the technician has an unusual number of consecutive identical readings (flags above 20; a count above 20 may indicate the detector was not being moved between readings)
  • Dwell Time Near-Minimum — average seconds the technician spent above the site minimum dwell time, vs. the site average
  • Near-Threshold Pattern — percentage of readings just below the leak threshold, vs. site average (a high percentage relative to the site may indicate threshold-avoidance behavior)
  • Time on Tools — percentage of field time the technician spent actively using the detector. Target: ≥80% (green), 70–80% (yellow), <70% (red)
  • LSTAR Daily Score — line chart of daily LSTAR scores for the period, with average, minimum, maximum, Hero Days (days scoring ≥80), and current hero streak

Site Stats​

Four summary tiles showing site-wide statistics for the current period:

TileShows
Site InspectionsTotal inspections completed, period label, and number of active technicians
Site Leak RatePercentage of inspections with a leak finding (count / total)
Site Field HoursTotal field hours estimated from person-days × average hours per day
Site ThroughputAverage inspections per hour across all technicians

Leak Charts​

Three charts showing leak data:

  • Leaks by Location Unit — bar chart of leak counts by LUnit for the current period
  • Leaks by Component Type — bar chart of leak counts by component type for the current period
  • Leaks by Month — bar chart of leak counts for the trailing 12 months

Avg Repair Time by Unit​

A bar chart showing the average number of days from leak open to leak closed (repaired) for each Location Unit. Excludes DOR-closed leaks. Timestamp shown below the chart indicates when the data was last calculated.

Database Health​

Two side-by-side panels that surface configuration gaps and equipment status.

Component & Configuration

ItemFlags when
TU items past return dateAny TUx items have not been returned by their expected return date

Equipment & Operations

ItemFlags when
Precision calibration overdueDetectors with a precision calibration past due
Daily calibration overdueDetectors with a daily calibration past due
Cal cylinder expirationCalibration cylinder(s) expiring within a threshold window (shown in days)
Tech certificationTechnician certifications expiring within the threshold window (shown in days)
API BudgetAPI token calls used vs. the monthly limit

Items shown in green are within acceptable range. Orange = approaching a threshold. Red = overdue or exceeded.

Custom Widgets​

In addition to the built-in widgets, you can add your own charts and tables to the dashboard.

Adding a custom widget

  1. Click Edit Dashboard to enter edit mode
  2. Click + Add Custom Widget at the bottom of the page
  3. Fill in the Add Custom Widget panel:
FieldDescription
TitleName for the widget, displayed in the widget header
Data SourceWhat data to query: Inspections, Leaks, or Components (Tours coming soon)
Chart TypeBar, Line, Number, or Table
Group ByField to group the results by (e.g., Component Type, LUnit, Technician)
ShowWhat to measure (e.g., Count of inspections, Count of leaks, Count of components)
FiltersNarrow the data. Available filters depend on the data source:

Inspections filters: Date Range, Inspection Type, Result, Why, Technician, Manually Entered, Component Type, Location Unit

Leaks filters: Date Range, Status, Component Type, Location Unit, Days Open

Components filters: Profile, Component Type, Location Unit

  1. A live Preview appears in the panel as you configure the widget
  2. Click Save to Dashboard

Saved custom widgets display a CUSTOM badge in their title bar. In edit mode, custom widgets show Edit and Delete buttons in addition to the standard size controls.